Lead paint disclosure form
Renting out a home built before 1978? Federal law requires this disclosure, signed by both sides, before the tenant is bound by the lease. The sheet follows the regulation's required elements in order, with the warning statement word for word.
Pre-filled with an example. Add each lead report you hold as a line below; leave the list empty if you have none.
Lead-based paint disclosure (lessor)
Lead records and reports you hold (one per line)
Preview
DISCLOSURE OF INFORMATION ON LEAD-BASED PAINT AND/OR LEAD-BASED PAINT HAZARDS
Attachment to the lease for: 27 Orchard Row, Apt 3
Year built: 1962 Lease begins: 1 December 2026
LEAD WARNING STATEMENT
Housing built before 1978 may contain lead-based paint. Lead from paint, paint chips, and dust can pose health hazards if not managed properly. Lead exposure is especially harmful to young children and pregnant women. Before renting pre-1978 housing, lessors must disclose the presence of known lead-based paint and/or lead-based paint hazards in the dwelling. Lessees must also receive a federally approved pamphlet on lead poisoning prevention.
LESSOR'S DISCLOSURE (initial)
_____ (a) Presence of lead-based paint and/or lead-based paint hazards:
Lessor has no knowledge of lead-based paint or lead-based paint hazards in the housing
_____ (b) Records and reports available to the lessor:
Lessor has no reports or records pertaining to lead-based paint and/or lead-based paint hazards in the housing.
LESSEE'S ACKNOWLEDGMENT (initial)
_____ (c) Lessee has received copies of all information listed above.
_____ (d) Lessee has received the pamphlet Protect Your Family From Lead in Your Home.
CERTIFICATION OF ACCURACY
The following parties have reviewed the information above and certify, to the best of their knowledge, that the information they have provided is true and accurate.
Lessor: M. Reyes Signature: ________________ Date: [date]
Lessee: Dana Whitfield Signature: ________________ Date: [date]
Lessor keeps a signed copy for at least 3 years from the start of the lease.Not legal advice. The federal rule sets the minimum; some states and cities add their own lead disclosures. HUD-assisted housing has further rules beyond this sheet.
Federal minimum, not legal advice
This sheet covers the federal disclosure for a private rental. Some states and cities add their own lead rules, and federally owned or HUD-assisted housing must also meet the further requirements in 24 CFR part 35. Check both before you rely on this form alone.
Does the rule cover your unit?
The rule applies to every lease or sublease of "target housing" unless one of the exemptions fits. The test is the build date and the unit, not whether you have ever seen peeling paint.
| Situation | Disclosure needed? | Where it comes from |
|---|---|---|
| Built in 1978 or later | Not covered | Target housing is housing built before 1978 |
| Studio, efficiency or a single rented room | Exempt, unless a child under 6 lives or is expected to live there | 0-bedroom dwelling |
| Housing for the elderly or persons with disabilities | Exempt, with the same child-under-6 exception | Target housing definition |
| Lease of 100 days or less, no renewal or extension possible | Exempt | § 745.101(c) |
| Found lead-based paint free by a certified inspector | Exempt | § 745.101(b) |
| Renewal, everything already disclosed, nothing new learned | Exempt | § 745.101(d) |
Source: 40 CFR part 745, subpart F (EPA), and HUD's matching 24 CFR part 35, subpart A, both checked 2026-10-18.
If you are unsure whether an exemption fits, disclose anyway. A completed form costs you one signature; a missing one is a federal violation.
What the form must contain
The regulation lists the elements a lease of target housing must include, either attached or written into the lease, in the language of the lease. The sheet above carries each one:
- 01The Lead Warning Statement, in the regulation's exact words. Do not shorten or reword it.
- 02Your disclosure of known lead-based paint or hazards, or a statement that you have no knowledge of any. If you know of some, say where it is, what the finding was based on, and what condition the painted surfaces are in.
- 03A list of the records and reports you have given the tenant, or a statement that there are none. In a multi-unit building this includes reports on common areas and building-wide evaluations.
- 04The tenant's acknowledgment that they received that information and the lead pamphlet.
- 05An agent statement, only if a leasing agent or property manager is involved. Fill in the agent line and the sheet adds it.
- 06Signatures and dates of the lessor, any agent and the tenants, certifying their statements are accurate to the best of their knowledge.
Nothing in the rule makes you test the unit. It requires you to pass on what you know and what you hold.
When to hand it over
All of it, including the pamphlet, has to happen before the tenant is bound by the lease. If the tenant has already made an offer to lease before you disclose, you must finish the disclosure before you accept it, and give them a chance to review it and change their offer. Handing the form over with the rental application avoids that problem entirely.
The simplest habit: staple the signed form to the lease at signing, as covered in how to write a lease agreement. At renewal you can skip it only if you disclosed everything before and have learned nothing new since; any new report means a fresh form. The renewal steps are in the lease renewal guide.
Keeping the record
Keep the signed form, or the lease that contains it, for at least 3 years from the start of the lease. A knowing violation can make you liable to the tenant for three times their damages, and a court may add their costs and attorney fees if they win. Federal civil penalties come on top.
File it with the rest of the tenancy record: the lease, the rent ledger and the move-in and move-out inspection reports. If the tenancy outlasts three years, keep the form for as long as you keep the lease.
Repairs in a pre-1978 rental
Disclosure is not the only lead rule a landlord meets. Repair work that disturbs painted surfaces falls under EPA's renovation rule unless it stays within the minor-repair limits: 6 square feet or less of painted surface per room inside, or 20 square feet or less outside, with no window replacement or demolition of painted surfaces (40 CFR 745.83, checked 2026-10-18). Above those limits, the work must be directed by a certified renovator and follow the rule's work practices. Log the size of each paint-disturbing job on the maintenance request form so you can show which side of the line it fell on.
Sources read for this page
- 40 CFR part 745 subpart Fchecked 2026-10-18
- 24 CFR part 35 subpart Achecked 2026-10-18
- 40 CFR part 745 subpart Echecked 2026-10-18
- EPA lead disclosure rulechecked 2026-10-18